Projects / Marlow Methodist Church – Floor Restoration

Marlow Methodist Church – Floor Restoration

The existing church floor has failed and this project is for a replacement by providing and laying a sand and cement screed to the communion area. Preparing exposed surface of concrete slab by removing bitumen in readiness for new floor finishes Providing and laying a high performance waterproof surface membrane, neoprene primer, 3mm underlay screed followed by a base to level the screed to same height as existing wood block flooring.

EB Number

43013

Estimated Start

Estimated Finish

Postcode

SL7 3HJ

Amount

43498.00

Object Type(s)

E

Find a Funder for Your Project.